#+TITLE: HQ Orchestrator Architecture, Orch Consensus Validation, and Beads Cleanup #+DATE: 2026-01-11 #+KEYWORDS: hq, orchestrator, orch-consensus, beads, worker-cli, multi-agent, architecture, lego-brick #+COMMITS: 4 #+COMPRESSION_STATUS: uncompressed * Session Summary ** Date: 2026-01-11 (Continuation of multi-agent architecture work) ** Focus Area: HQ orchestrator design, architecture validation via orch consensus, and beads issue management * Accomplishments - [X] Named the orchestrator "HQ" (headquarters) - 2 chars, fits naming convention (bd, orch) - [X] Defined HQ as a skill, not a binary - any agent with the skill can orchestrate - [X] Ran orch consensus on bd comments vs JSONL for inter-agent messaging - unanimous support for bd comments - [X] Ran orch consensus on overall architecture - validated "Lego brick" approach with gap analysis - [X] Created HQ feature issue (skills-2l4e) with 4 sub-tasks - [X] Filed 5 new issues from consensus gap analysis (garbage collection, context pruning, event notification, retry limits, state machine docs) - [X] Closed skills-ms5 (message passing layer) - solved by bd comments decision - [X] Closed skills-iusu (bd comments evaluation) - complete, unanimous consensus - [X] Closed skills-s6y (Lego architecture epic) - MVP complete, architecture validated - [X] Unblocked 17 design/research tasks (blocked count: 23 → 4) - [X] Fixed worktree path bug - now uses absolute paths - [X] Added scenario schema and test fixtures for benchmark harness - [X] Completed session close protocol - all changes committed and pushed * Key Decisions ** Decision 1: Name the orchestrator "HQ" - Context: Needed a short, memorable name for the orchestration skill - Options considered: 1. helm - taken by Kubernetes package manager 2. con (conductor) - too short, ambiguous 3. deck - nautical theme but unclear 4. cap (captain) - too generic 5. ops - conflicts with operations 6. hq (headquarters) - 2 chars, clear meaning - Rationale: HQ is short (2 chars like bd, orch), universally understood, implies coordination/command center - Impact: All orchestration work will use "hq" as the skill name and CLI prefix ** Decision 2: HQ is a skill, not a daemon/binary - Context: How should the orchestrator be implemented? - Options considered: 1. Daemon/service watching for events 2. CLI binary with polling 3. Skill (markdown instructions + scripts) that any agent can load - Rationale: A skill fits the "Lego brick" philosophy - no new infrastructure, any capable agent becomes an orchestrator by loading the skill - Impact: Implementation focuses on SKILL.md design and helper scripts rather than new binaries ** Decision 3: Use bd comments for inter-agent messaging (unanimous consensus) - Context: How should agents communicate status and coordinate? - Options considered: 1. Option A: Use existing bd issue comments (append-only, structured prefixes) 2. Option B: Build new JSONL message transport layer - Rationale: Orch consensus (flash-or, gemini, gpt, qwen) unanimously supported Option A: - Unified source of truth with issue tracker - Zero infrastructure overhead - Human-readable and debuggable - Context size manageable with --last N and periodic summarization - Impact: Closed skills-ms5, no new message layer needed, focus on bd comment conventions ** Decision 4: Close skills-s6y (Lego epic) to unblock dependent work - Context: 17 design/research issues blocked by the main architecture epic - Rationale: - Core MVP complete: worker CLI, state machine, review-gate, branch isolation - Architecture validated by orch consensus - Remaining blocked items are design tasks that can proceed - Impact: Blocked count dropped from 23 to 4, ready-to-work increased from 21 to 38 * Problems & Solutions | Problem | Solution | Learning | |---------|----------|----------| | Relative worktree path failed from inside worktree | Changed worktreePath() to use findMainRepoDir() for absolute paths | Always use absolute paths for operations that may run from different working directories | | Test suite didn't catch path bug because it bypassed done command | Bug discovered during manual spike testing | Manual integration tests catch what unit tests miss | | 23 issues blocked by architecture epic | Closed epic after MVP complete, architecture validated | Epics should be closed when core work is done to unblock dependent tasks | | Qwen returned empty response in orch consensus | Other 3 models provided clear responses | Multi-model consensus is robust to individual model failures | * Technical Details ** Code Changes - Total files modified: 15 (across all commits) - Key files changed: - =src/worker/utils.nim= - Fixed worktreePath() to return absolute path using findMainRepoDir() - =src/worker/tests/test-worker.sh= - Added sqlite3 availability check - New files created: - =docs/specs/scenario-schema.md= - YAML schema for agent capability test scenarios - =tests/scenarios/easy/add-factorial.yaml= - Easy difficulty test scenario - =tests/scenarios/medium/add-caching-to-api.yaml= - Medium difficulty scenario - =tests/scenarios/hard/fix-race-condition.yaml= - Hard difficulty scenario - =tests/fixtures/python-math-lib/= - Python fixture for testing - =tests/fixtures/flask-user-api/= - Flask API fixture placeholder ** Commands Used #+begin_src bash # Orch consensus queries orch query --models flash-or,gemini,gpt,qwen "Support or challenge..." # Beads management bd close skills-ms5 --reason="Solved by bd comments approach..." bd close skills-s6y --reason="MVP complete: worker CLI, state machine..." bd blocked # Check remaining blocked issues bd stats # Verify impact of closures # Session close protocol bd sync git add git commit -m "..." git push #+end_src ** Architecture Notes - HQ skill structure: SKILL.md (instructions) + helper scripts (hq-status, hq-spawn, hq-check) - Worker template: System prompt for workers operating in worktree context - BD comments as message layer: Structured prefixes (status:, plan:, agent:), --last N filtering, periodic summarization - Gaps identified by consensus: garbage collection, locking/race conditions, context pruning, cost budgets, retry limits, state machine invariants * Process and Workflow ** What Worked Well - Orch consensus for validating architecture - multiple perspectives caught gaps - Manual spike testing - found real bug that tests missed - Batch closing related issues - efficient beads management - Session compaction preserved essential context for continuation ** What Was Challenging - Balancing design depth vs implementation progress - Determining when an epic is "done enough" to close - Qwen returning empty response (compensated by other models) * Learning and Insights ** Technical Insights - Absolute paths essential for operations that run from different directories - Git worktree path resolution is context-dependent - Multi-model consensus provides robust architectural validation ** Process Insights - Orch consensus is effective for binary decisions (Option A vs B) - Closing blocking epics when core work is done unblocks significant downstream work - Manual integration spikes catch issues automated tests miss ** Architectural Insights - "Skill as orchestrator" pattern avoids infrastructure complexity - Existing primitives (bd comments) often sufficient - resist building new layers - Unix philosophy applies to AI orchestration: small, composable, text-based * Context for Future Work ** Open Questions - How should HQ handle concurrent human + agent modifications? - What's the right heartbeat/timeout for stale worker detection? - How to summarize bd comment history without losing critical context? - Should HQ be model-agnostic or tuned for specific models? ** Next Steps Ready-to-work issues (now unblocked): - skills-21ka: Design HQ SKILL.md - orchestration instructions - skills-cg7c: Design worker system prompt template - skills-3j55: Create hq-status script - skills-w9a4: Garbage collection / janitor for orphaned workers - skills-8hyz: Context pruning for bd comments - skills-vdup: Retry limits and escalation policy - skills-s2bt: State machine invariants documentation ** Related Work - Previous worklog: [[file:2026-01-11-worker-cli-cleanup-refactors.org][Worker CLI Cleanup]] (same day, earlier session) - Previous worklog: [[file:2026-01-10-multi-agent-lego-architecture-design.org][Multi-Agent Lego Architecture Design]] - Orch consensus output: /tmp/claude/-home-dan-proj-skills/tasks/b019872.output (architecture validation) - Orch consensus output: /tmp/claude/-home-dan-proj-skills/tasks/b6d9640.output (bd comments decision) * Raw Notes ** Orch Consensus Summary: BD Comments vs JSONL All 4 models (flash-or, gemini, gpt, qwen) supported Option A (bd comments): - "Fits your 'Lego bricks' principle" (GPT) - "Unified source of truth means human developers and AI agents share the same context" (Gemini Flash) - "Avoid the 'distributed systems' trap of syncing a separate message layer" (Gemini) - "Lower maintenance overhead... reduces complexity and potential failure points" (Qwen) Recommended mitigations for context size: - --last N filtering - Structured prefixes (status:, plan:, agent:) - Periodic summarization by manager agent - State checkpoints in pinned comments ** Orch Consensus Summary: Architecture Validation Support with identified gaps: 1. Garbage collection - orphaned worktrees, stuck workers, abandoned locks 2. Locking/race conditions - file locks with TTL, idempotent operations 3. Context pruning - summarize closed issue history 4. Cost/budget controls - token limits, spawn limits 5. Retry limits - escalate to human after N failures 6. State machine invariants - document allowed transitions 7. Event notification - inotify/watcher vs polling tradeoff ** Beads Status After Session - Open: 42 (was 44) - Blocked: 4 (was 23) - Ready to work: 38 (was 21) - Closed: 200 (was 197) Remaining blocked issues (legitimate dependencies): - skills-2l4e (HQ) - blocked by its sub-tasks - skills-kg7 (Desktop automation) - blocked by AT-SPI chain - skills-hf1 (Cross-agent portability) - blocked by research tasks * Session Metrics - Commits made: 4 (excluding bd sync commits) - Files touched: 15 - Lines added/removed: +660/-26 - Issues created: 6 (HQ feature + 5 gap tasks) - Issues closed: 3 (ms5, iusu, s6y) - Issues unblocked: 17