Commit graph

6 commits

Author SHA1 Message Date
Dan c4a00356fc Add comprehensive security & validation test report for Generation 31
Performed full security audit including:
- Matrix API endpoint validation
- TLS/nginx reverse proxy verification
- sops-nix secrets management testing
- Firewall and network security analysis
- SSH hardening verification
- Database connectivity and permissions
- System integrity and log review

Results: All critical tests PASSED
- Excellent network isolation (Matrix/PostgreSQL localhost-only)
- Proper secrets encryption with sops-nix
- Strong SSH hardening (key-only authentication)
- Valid TLS with HSTS enabled
- Minimal attack surface (only SSH/HTTP/HTTPS exposed)

Known issues documented:
- mautrix-slack exit code 11 (non-critical)
- fail2ban not enabled (optional enhancement)
- Forgejo migrations in progress (temporary)

System validated as PRODUCTION READY.

Generated with Claude Code

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-21 22:25:08 -07:00
Dan 64246a6615 Deploy Generation 31 with sops-nix secrets management
Successfully deployed ops-jrz1 Matrix platform to production VPS using
extracted modules from ops-base. Validated deployment workflow following
ops-base best practices: boot -> reboot -> verify.

Changes:
- Pin sops-nix to June 2024 version for nixpkgs 24.05 compatibility
- Configure sops secrets for Matrix registration token and ACME email
- Add encrypted secrets.yaml (safe to commit, encrypted with age)
- Document deployment process and lessons learned

All services verified running:
- Matrix homeserver (matrix-continuwuity): conduwuit 0.5.0-rc.8
- nginx: Proxying Matrix and Forgejo
- PostgreSQL 15.10: Database services
- Forgejo 7.0.12: Git platform

Generated with Claude Code

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-21 21:32:23 -07:00
Dan dbbe460ad0 Add worklog documenting migration strategy and deployment planning
Documents:
- Server relationship clarification (ops-base → ops-jrz1 same VPS)
- Analysis of 4 migration approaches (in-place, parallel, fresh, dual VPS)
- Comprehensive 7-phase migration plan with rollback procedures
- ops-base repository analysis (vultr-dev config, deployment patterns)
- VM testing options and local validation strategies
- Risk assessment and safety layers (build, VM, test mode, generations)

Planning session: 100 minutes, 0 commits, strategic analysis only
Next steps: Execute migration, VM test, Phase 4 docs, or pause
2025-10-14 21:02:05 -07:00
Dan 9ea22ac5b1 Add worklog documenting Phase 3 module extraction
Documents:
- ops-base structure verification
- Extraction of 8 modules + 2 configurations
- Automated sanitization and validation
- Flake integration with sops-nix and nixpkgs-unstable
- Build validation (nix flake check and build passed)
- 28 tasks complete (T012-T039)

Progress: 39/125 tasks (31.2%), 53.4% of MVP complete
2025-10-13 16:22:41 -07:00
Dan ab5aebb161 Phase 3: Extract and sanitize Matrix platform modules from ops-base
Extracted modules:
- Matrix homeserver (matrix-continuwuity.nix)
- mautrix bridges (slack, whatsapp, gmessages)
- Security modules (fail2ban, ssh-hardening)
- Development services module
- Matrix secrets module

All modules sanitized to remove personal information:
- Domains: example.com, matrix.example.org
- IPs: 10.0.0.x, 203.0.113.10
- Paths: /home/user, /path/to/ops-base
- Emails: admin@example.com

Configuration:
- Updated flake.nix with sops-nix and nixpkgs-unstable
- Updated hosts/ops-jrz1.nix to import all extracted modules
- Added example files (secrets, minimal config)
- Generated flake.lock

Generated with Claude Code - https://claude.com/claude-code
2025-10-13 14:51:14 -07:00
Dan 6a26ca12ca Add worklog documenting Phase 1 & 2 foundation setup
Documents:
- Directory structure and NixOS config skeleton creation
- Sanitization/validation scripts with 22 rules implementation
- Git hooks configuration (pre-commit, pre-push)
- 5 key architectural decisions with rationale
- 7 problems/solutions encountered
- Foundation review results (all checks passed)
- Phase progress: 11/125 tasks complete (8.8%)

29KB uncompressed worklog ready for semantic compression.
2025-10-13 13:42:40 -07:00